Estimated 200 permanent jobs with average salary of $64,000. No zoning currently exists in Deuel County, which must be addressed before construction. Company has offered tours of existing facility in Ellendale, North Dakota.

Investment$16.0B
Power Capacity430 MW
LocationToronto, Deuel County, South Dakota
StatusPlanned

project overview

Estimated 200 permanent jobs with average salary of $64,000. No zoning currently exists in Deuel County, which must be addressed before construction. Company has offered tours of existing facility in Ellendale, North Dakota.

location and scale

LocationToronto, Deuel County, South Dakota
RegionEastern South Dakota
StatusPlanned
Total Investment$16.0B
Power Capacity430 MW
Total Area1.8M sq ft

key stakeholders

SponsorsApplied Digital
OperatorsApplied Digital

investment breakdown

The $16.0 billion investment is distributed across multiple components:

ComponentAmountPercentage
IT Equipment (GPUs, servers, networking)$10.4B65%
Building and Construction$3.2B20%
Power Infrastructure$1.6B10%
Other (cooling, security, land)$800M5%

equipment refresh cycles

IT equipment typically requires replacement every 3-5 years, meaning:

  • Initial deployment: $10.4B
  • 3-year refresh: Additional $8.3B estimated
  • Total over 10 years: $26.0B in equipment

infrastructure requirements

power capacity

The facility requires 430 MW of power capacity:

Total Power Capacity430 MW
Equivalent Homes Powered358,333
Annual Energy Consumption3,766 GWh/year
Renewable EnergyYes - committed to renewable sources

facility specifications

Total Area1.8M sq ft
Raised Floor Space1.3M sq ft (estimated)
Power Density338 W/sq ft

sustainability and cooling

Cooling TechnologyAir cooling systems
Renewable EnergyYes - renewable energy integration

Cold climate reduces cooling costs and water consumption. Site selected near gas turbine and pipeline infrastructure.


construction timeline

Announced2025-04
Construction Start2026
Expected Completion2027-2028

economic impact analysis

job creation

Peak Construction Jobs32,000
Permanent Operations Jobs86
Average Salary (estimated)85,00085,000 - 120,000

economic multiplier effects

The project’s total economic impact extends beyond direct investment:

Direct Investment$16.0B
Total Economic Impact (2.5x multiplier)$40.0B
Estimated Annual Tax Revenue$80M
30-Year Tax Revenue$2.4B

regional benefits

The project brings significant benefits to South Dakota:

  • Supply chain development: Local suppliers for construction materials, equipment, and services
  • Infrastructure investment: Improved power grid, roads, and telecommunications
  • Technology ecosystem: Attracts related tech companies and talent
  • Educational partnerships: Training programs and university collaborations
  • Real estate development: Increased commercial and residential development

technical specifications

workload types

Workload TypeDescription
AI-MLArtificial Intelligence and Machine Learning training and inference
HYPERSCALELarge-scale cloud computing and storage
CLOUDPublic cloud services and platforms

ai/ml capabilities

This facility is specifically designed for AI/ML workloads with:

  • High-density GPU computing: NVIDIA H100, H200, or GB200 GPUs
  • Advanced cooling: Direct-to-chip liquid cooling for high power densities
  • High-speed networking: 400G/800G Ethernet or InfiniBious InfiniBand
  • Massive storage: Multi-exabyte storage capacity for training data
  • Low-latency architecture: Optimized for distributed training workloads

rack density and power

Rack Power Density30-100+ kW per rack (AI-optimized)
Cooling TechnologyDirect liquid cooling (DLC) / Immersion cooling
PUE Target1.1 - 1.3 (industry leading)

strategic importance

competitive positioning

This mega-project represents a strategic investment by Applied Digital to:

  • AI Leadership: Establish dominance in AI infrastructure and capabilities
  • Compute Capacity: Scale compute resources for next-generation AI models
  • Competitive Response: Match or exceed competitor AI infrastructure investments
  • Cloud Expansion: Grow public cloud market share and regional presence
  • Customer Proximity: Reduce latency for regional enterprise customers
  • Service Diversity: Enable new services requiring massive compute resources

national infrastructure significance

As a mega-project (>$10B investment), this facility:

  • Represents a major commitment to US technology infrastructure
  • Contributes to national AI competitiveness and security
  • Demonstrates South Dakota’s emergence as a datacenter hub
  • Sets new standards for scale and efficiency in datacenter design

regional integration

South Dakota datacenter ecosystem

This project integrates into South Dakota’s growing datacenter infrastructure:

  • Power grid integration: Connection to regional transmission infrastructure
  • Fiber connectivity: Access to major internet backbone routes
  • Skilled workforce: Leverage regional technical talent and training programs
  • Supply chain: Integration with local construction and equipment suppliers

community relations

Large-scale datacenter projects require strong community partnerships:

  • Local hiring commitments: Priority hiring for construction and operations roles
  • Educational partnerships: STEM programs and technical training initiatives
  • Infrastructure improvements: Road, water, and utility infrastructure upgrades
  • Tax revenue sharing: Property tax and incentive agreements with local governments

Deuel County impact

The project specifically impacts Deuel County through:

  • Direct property tax revenue and economic development incentives
  • Increased demand for housing, retail, and professional services
  • Enhanced infrastructure that benefits broader community
  • Recognition as a technology and innovation center

stakeholder analysis

project sponsors

Applied Digital

The sponsoring organizations bring complementary capabilities:

  • Applied Digital: Strategic partner and stakeholder

operators and tenants

Primary Operators: Applied Digital

The operators manage day-to-day facility operations including power, cooling, security, and network management.


sources and references

  1. Applied Digital proposes multi-billion-dollar data center in South Dakota - Data Center Dynamics - https://www.datacenterdynamics.com/en/news/applied-digital-proposes-multi-billion-dollar-data-center-in-south-dakota/
  2. Potential $14 Billion Data Center Could Transform Deuel County’s Economy - KXLG - https://www.mykxlg.com/news/local/potential-14-billion-data-center-could-transform-deuel-countys-economy/article_2a031739-b2ae-4932-95f5-57e4f280b7c7.html
  3. Deuel County Commission hears proposal for multi-billion-dollar data center - Dakota News Now - https://www.dakotanewsnow.com/2025/04/17/deuel-county-commission-hears-proposal-multi-billion-dollar-data-center/
  4. New AI data center wave could transform rural South Dakota, advocates say - South Dakota Public Broadcasting - https://www.sdpb.org/business-economics/2025-05-27/new-ai-data-center-wave-could-transform-rural-south-dakota-advocates-say
  5. Company says data center could bring millions to state, Deuel County - South Dakota Public Broadcasting - https://www.sdpb.org/business-economics/2025-05-02/company-says-data-center-could-bring-millions-to-state-deuel-county

analysis current as of October 2025

on this page