state policy competition for datacenters

on this page

overview

states are engaged in fierce competition for datacenter investments through aggressive tax incentive packages, streamlined permitting, and dedicated energy allocations. this analysis examines 50 states’ strategies to attract $1.1 trillion in announced datacenter projects, revealing a landscape where virginia’s mature incentive regime competes with emerging challengers offering faster approvals and lower operational costs.

the competitive dynamics are shifting from pure tax giveaways toward value-based competition: infrastructure readiness, power availability, workforce quality, and climate credentials. states like pennsylvania (17 gw pipeline), texas (10,978 mw capacity), and ohio (10 projects, $33b) are challenging virginia’s historical dominance.

state competition landscape

MetricValue
States with Datacenter Projects (2022-2025)50 states
Total Investment (All States)$1.1 trillion
Top State by Projects (Virginia)40 projects
Top State by Investment (New Mexico)$167 billion (6 projects)
Fastest Growing (Pennsylvania)$125 billion (12 projects)
States with Sales Tax Exemptions27+ states
Average Property Tax Abatement85-95%
Typical Investment Threshold25m25m-250m

top 10 states by investment

1. new mexico - $167 billion (6 projects)

mega-project strategy: small number of transformational investments

key advantages

  • low power costs: $0.08-0.10/kwh industrial rates
  • renewable energy: 55% of grid already renewable (solar/wind)
  • western interconnect: access to california/arizona markets
  • federal land availability: 34% of state is federal land, streamlined for energy projects

major projects

  • meta ai datacenter cluster: $60+ billion estimated investment
  • microsoft renewable energy campus: $10 billion with dedicated solar farms
  • google southwestern hub: expanding from existing facilities

incentive package

  • technology jobs tax credit: up to $12,500 per job for qualified positions
  • industrial revenue bonds: tax-exempt financing for equipment
  • property tax abatements: up to 10 years at 50-75% reduction
  • no state sales tax on equipment: saves 5.125% on billions in purchases

competitive edge: abundant renewable energy + low land costs + proximity to texas/california markets makes new mexico attractive for ai workloads requiring massive compute.


2. kansas - $129 billion (9 projects)

emerging hyperscale destination leveraging central location and renewable energy

key advantages

  • wind power leadership: 47% of electricity from wind (highest in us)
  • low land costs: $5,000-15,000/acre for industrial sites
  • central us location: low latency to east/west coasts
  • water availability: ogallala aquifer for cooling (though declining)

major projects

  • meta kansas hyperscale complex: $75+ billion investment announced 2024
  • google council grove cluster: $20 billion renewable-powered campus
  • stargate kansas expansion: $30+ billion ai infrastructure

incentive framework

  • sales tax exemption: hb 2337 provides 100% exemption for datacenter equipment
  • property tax abatement: local governments offer 50-100% reductions for 10+ years
  • utility rate discounts: customized industrial rates 30-40% below residential
  • expedited permitting: 90-day approval process for qualifying projects

rapid ascent: kansas went from zero major datacenters in 2022 to $129 billion in announcements by 2025, fastest state transformation in the industry.


3. pennsylvania - $125 billion (12 projects)

rust belt resurgence through energy infrastructure and strategic location

energy advantage

  • pjm interconnection: largest us grid operator, reliable power supply
  • nuclear baseload: 9 reactors providing 24/7 carbon-free power
  • natural gas access: marcellus shale enables low-cost peaker plants
  • hydrogen hubs: $7 billion federal investment in appalachian hydrogen economy

major projects

  • aws pennsylvania megaplex: $40+ billion multi-county expansion
  • microsoft keystone campus: $25 billion with nuclear power contracts
  • meta philadelphia corridor: $20 billion leveraging northeast connectivity
  • stargate pennsylvania hub: $15 billion ai-focused development

policy environment

  • datacenter promotion act (proposed): streamlines approvals, clarifies incentives
  • cost-responsibility movement: legislature debating requirement for datacenter-funded grid infrastructure
  • job creation tax credits: $5,000-10,000 per qualified position
  • energy credits: bonus incentives for 24/7 carbon-free power matching

strategic positioning: pennsylvania combines pjm grid reliability + federal clean energy funding + proximity to northeast markets to challenge virginia’s dominance.


4. georgia - $79.8 billion (25 projects)

southeast hub with mature incentive programs and pro-business environment

established advantages

  • southern company territory: reliable utility with datacenter specialization
  • atlanta connectivity: major fiber hub, low latency to east coast
  • workforce availability: georgia tech, university system produces technical talent
  • pro-business culture: fast permitting, regulatory cooperation

major projects

  • google douglas county expansion: $25+ billion across multiple buildings
  • microsoft atlanta region: $15 billion for azure availability zones
  • meta forest park campus: $2.5 billion flagship facility
  • oracle cloud southeast: $10+ billion multi-tenant development

incentive structure

  • sales tax exemption: 100% exemption for qualifying equipment (sb 151)
  • investment threshold: $250 million + 20 jobs at 1.5x average wage
  • property tax: negotiated freeport exemptions with local counties
  • job tax credit: up to $4,000/job in tier 1 counties
  • power rate structures: customized large-load tariffs

policy stability: georgia has maintained consistent datacenter policy for 15+ years, providing predictability valued by hyperscale operators planning decade-long buildouts.

fiscal impact: projected 327millioninforegonerevenuefor2026,butgenerating327 million in foregone revenue for 2026**, but generating **500+ million in economic activity through construction, operations, and supply chain.


5. texas - $78.2 billion (27 projects)

deregulated market creates opportunities and challenges

competitive factors

  • ercot deregulation: datacenters can contract directly with generators
  • renewable buildout: 40+ gw of solar/wind capacity, more planned
  • land availability: massive industrial sites at low costs
  • business-friendly: no corporate income tax, limited regulation

major projects

  • stargate abilene: $40 billion openai/oracle ai infrastructure (operational)
  • vantage frontier: $25 billion, 1.4 gw west texas mega-campus
  • meta fort worth expansion: $1.5 billion, 2.6m sq ft campus
  • google ellis county duo: $1.2 billion with 375 mw solar ppas

policy evolution

  • sb-6 (2023): requires datacenters to fund grid infrastructure costs
  • end of “free” interconnection: operators pay for substation/transmission upgrades
  • cost-responsibility model: estimated $500m-1b per major project for grid infrastructure
  • sales tax exemption: available for qualifying equipment purchases

strategic shift: texas moving from pure incentive competition to cost-responsibility framework, betting that market size and renewable energy compensate for reduced subsidies.

grid challenges: 2025 ercot summer demand forecast shows datacenter load growing 5-8 gw annually, raising reliability concerns addressed through sb-6 infrastructure requirements.


6. arizona - $63.4 billion (22 projects)

semiconductor synergy with tsmc driving datacenter co-location

unique positioning

  • chips act cluster: tsmc $65b investment creates datacenter demand
  • solar resources: abundant cheap solar (lowest lcoe in continental us)
  • western interconnect: access to california hyperscale market
  • data sovereignty: proximity to mexico for nearshoring strategies

major projects

  • edgecore mesa campus: $15 billion, 1.5 gw hyperscale development
  • cyrusone phoenix metro: $8 billion multi-site expansion
  • aligned mesa ii: $5 billion ai-optimized facilities
  • stack infrastructure west valley: $4 billion new campus

incentive framework

  • prime contracting exemption: saves 9.8% on construction materials
  • property tax incentives: class 6 assessment (5% of full cash value)
  • renewable energy mandates: 15% by 2025 drives clean power supply
  • water use restrictions: tightening, pushing toward closed-loop cooling

water challenge: arizona’s arid climate and declining colorado river allocations create sustainability constraints. new projects must demonstrate water-efficient cooling or face permitting delays.


7. virginia - $56.6 billion (40 projects)

market leader facing saturation but still dominant

historical advantages

  • first-mover benefit: built out infrastructure, workforce, supply chain
  • ashburn hub: 13% of global datacenter capacity in one metro area
  • aws headquarters effect: amazon’s clustering attracts ecosystem
  • fiber density: unmatched internet exchange and cross-connect infrastructure

major projects

  • aws $35b virginia commitment: across loudoun, spotsylvania, louisa counties
  • edgecore louisa: $17 billion, 1.1 gw mega-campus
  • microsoft azure expansion: $10+ billion northern virginia build-out
  • prince william digital gateway: $24.7 billion (34 buildings) - legally contested

incentive framework (mature)

  • dcrsut exemption: $928 million in annual tax savings (fy23)
  • mega datacenter program: 15-year extensions + up to $140m state grants
  • property tax reductions: henrico county 89% reduction (from 3.50to3.50 to 0.40/$100)
  • job requirements: 50 positions at 1.5x average wage ($150k+)

competitive pressures:

  • land scarcity: loudoun county approaching buildout capacity
  • grid constraints: dominion energy struggling to meet demand growth
  • community opposition: prince william digital gateway project voided by court (august 2025)
  • incentive fatigue: jlarc legislative review questioning cost-benefit ratio

strategic response: virginia expanding to central/southern regions (lynchburg, danville, halifax county) with cheaper land and available power, but lower connectivity.


8. north carolina - $49.3 billion (15 projects)

balanced approach between growth and community impact

strengths

  • duke energy territory: utility experienced with datacenter loads
  • research triangle: tech workforce from unc, duke, ncsu
  • moderate climate: lower cooling costs than florida/texas
  • southeast connectivity: between atlanta and northern virginia hubs

major projects

  • apple $4.7b research campus: includes private datacenter infrastructure
  • google lenoir expansion: $2+ billion multi-building campus
  • meta forest city campus: $6 billion investment announced 2025
  • microsoft charlotte region: $5 billion azure availability zones

policy framework

  • job development investment grant (jdig): cash grants based on job creation
  • sales tax refunds: 80% refund on datacenter equipment for qualifying projects
  • local incentives: counties offer property tax abatements case-by-case
  • renewable energy access: 12.5% requirement drives utility clean energy procurement

community focus: north carolina emphasizes local hiring requirements, apprenticeship programs, and community investment more than pure tax competition.


9. ohio - $33.2 billion (10 projects)

midwest opportunity with rapid acceleration

competitive advantages

  • pjm interconnection: reliable grid, proven datacenter performance
  • central location: low latency to 50% of us population
  • low operating costs: 20-30% below coastal markets
  • workforce: strong technical education system

major projects

  • meta prometheus: $1.5 billion, world’s first gigawatt-capable datacenter
  • google central ohio: $6.7 billion across new albany/lancaster/columbus
  • aws us east ohio region: $10.3 billion, 46 facilities
  • vantage oh1 campus: $2 billion, 192 mw new albany development

incentive strategy

  • job creation tax credit: up to 75% of income tax for new jobs
  • sales tax exemption: manufacturing and qualifying datacenter equipment
  • enterprise zone: 15-year property tax abatements in designated areas
  • expedited permitting: new albany offers 60-90 day approval timelines

new albany clustering: single suburb hosts meta, google, aws, vantage, qts, cologix creating ecosystem effects valued at $10-15 billion in spillover investment.


10. mississippi - $32.1 billion (10 projects)

unexpected contender through aggressive incentives

surprise positioning

  • low costs: among lowest operating costs in us
  • energy: abundant natural gas, growing solar
  • incentives: most aggressive tax packages in southeast
  • land: massive available industrial sites

major projects

  • aws jackson region: $10+ billion multi-site development
  • stargate mississippi hub: $8 billion announced 2025
  • microsoft gulf coast campus: $5 billion with hurricane-resilient design

ultra-competitive incentives

  • 100% property tax abatement: up to 10 years for qualifying projects
  • fee-in-lieu: fixed payments instead of assessed value taxes
  • sales tax exemption: construction materials + equipment
  • no corporate income tax: for qualified datacenters
  • workforce training grants: full reimbursement for training programs

calculated risk: mississippi betting foregone tax revenue pays off through construction spending, workforce development, and positioning for future growth.

best state policies

1. streamlined permitting (ohio new albany)

90-day approval process:

  • pre-zoned technology park: datacenter use by-right, no variances needed
  • concurrent reviews: environmental, utility, building permits run simultaneously
  • dedicated staff: city employs datacenter permitting specialists
  • predictable timeline: clear milestones, no surprises

results: new albany hosts 7+ major operators with $30+ billion in investments. model replicated by other states.


2. infrastructure pre-investment (pennsylvania)

grid infrastructure first:

  • pjm coordination: state works with grid operator on capacity planning
  • substation pre-building: utilities construct substations before datacenter demand
  • transmission upgrades: state funding for regional bottleneck relief
  • cost recovery: long-term rate structures spread costs, not upfront datacenter burden

outcome: 17 gw datacenter pipeline with shorter interconnection times than competing states.


3. clean energy integration (new mexico)

renewable energy first:

  • 55% renewable grid: already decarbonized before datacenter boom
  • renewable energy zones: pre-approved areas with transmission access
  • storage incentives: bonus credits for datacenters deploying battery storage
  • hourly matching: push toward 24/7 carbon-free power

attraction: clean energy credentials attract esg-conscious hyperscalers (google, microsoft, meta) willing to pay premium.


4. workforce development (north carolina)

community college partnerships:

  • customized training programs: 2-year degrees in datacenter operations
  • apprenticeships: operators fund on-the-job training with college credit
  • local hiring requirements: 50% of operations jobs from within 50 miles
  • career pathways: entry-level to senior technician advancement tracks

economic benefit: $60-80k jobs for non-college graduates, broader community impact than pure construction.

worst state policies

1. unfunded mandates (california)

regulatory complexity without support:

  • strict water regulations: limit cooling options but no investment in reclaimed water infrastructure
  • energy requirements: 100% clean energy by 2045 but inadequate transmission
  • permitting delays: 3-5 year timelines due to ceqa (environmental quality act)
  • high costs: 2-3x land/construction costs vs. competing states

outcome: california has 25 projects but $0 in disclosed investment for new builds. expansion of existing google/microsoft facilities only.


2. inconsistent policy (virginia prince william)

political volatility:

  • digital gateway approval: 27-hour meeting, approved december 2023
  • court reversal: entire project voided august 2025 by circuit court
  • community opposition: organized resistance after approval
  • uncertainty: $24.7 billion investment now in legal limbo

lesson: even “pro-business” states face nimby resistance and legal challenges when projects lack genuine community support.


3. underfunding infrastructure (texas ercot)

deregulation without planning:

  • market-only approach: no state coordination of datacenter + generation + transmission
  • reliability concerns: 2024 warnings of insufficient capacity
  • cost shift to operators: sb-6 requires datacenter-funded infrastructure but delays projects
  • summer 2025 risk: ercot forecasting 5-8 gw datacenter demand but only 3 gw new generation

challenge: texas growth exceeding grid expansion rate, creating potential reliability crisis.


4. incentive without accountability (mississippi)

giveaways without verification:

  • 100% tax abatements: before projects operational
  • no clawback provisions: if job targets missed, no penalty
  • limited transparency: deals negotiated privately, public disclosure minimal
  • fiscal risk: state assumes all downside if projects underperform

concern: mississippi could end up with stranded infrastructure and no tax revenue if projects fail or downsize.

cost-responsibility models

datacenter-funded infrastructure:

  • texas sb-6: requires operators pay for grid upgrades
  • oregon power act: datacenters must fund transmission/distribution improvements
  • pennsylvania legislation (proposed): infrastructure costs borne by beneficiaries

rationale: prevents residential ratepayers from subsidizing billion-dollar corporate infrastructure.

hourly renewable matching

beyond annual renewable energy credits:

  • google commitment: 24/7 carbon-free power by 2030
  • microsoft approach: hourly matching in all regions
  • state incentives: bonus ira credits for hourly matching vs. annual

impact: requires 4-6x more storage or diverse renewable portfolio (solar + wind + hydro + nuclear). increases project costs 15-25% but delivers genuine decarbonization.

community benefit agreements

negotiated packages:

  • local hiring minimums: 30-50% of operations workforce from nearby
  • infrastructure investments: roads, water, broadband funded by operator
  • tax payments: voluntary payments in lieu of full abatements
  • environmental commitments: water recycling, habitat restoration

leaders: oregon, washington, illinois requiring community benefit agreements for projects exceeding size thresholds.

water use restrictions

drought-driven policy:

  • arizona: requiring closed-loop cooling or groundwater impact statements
  • utah: limiting water use per mw of capacity
  • texas: prioritizing municipal water rights over industrial in shortages

technology response: shift to air cooling (less efficient but zero water) or reclaimed water systems in water-constrained regions.

regional competition dynamics

northeast corridor (virginia vs. pennsylvania vs. new york)

virginia advantages:

  • established infrastructure, ecosystem effects, fiber density
  • but: land scarcity, community opposition, grid constraints

pennsylvania advantages:

  • pjm reliability, lower costs, available land
  • but: permitting complexity, less connectivity

new york advantages:

  • hydropower, clean energy, financial capital access
  • but: highest costs, difficult permitting, limited suitable sites

outcome: market fragmenting with virginia retaining premium hyperscale/cloud, pennsylvania capturing overflow, new york focusing on edge/enterprise.

southeast (georgia vs. north carolina vs. south carolina)

georgia maturity: established hub with 25 projects but reaching saturation north carolina balance: moderate growth with workforce quality focus south carolina aggression: ultra-competitive incentives to catch up

power dynamics: dominion energy (sc), duke energy (nc), southern company (ga) all competing to position territories as datacenter-friendly.

midwest (ohio vs. indiana vs. illinois vs. wisconsin)

ohio new albany clustering: concentration creates network effects indiana competitiveness: matching ohio incentives, promoting lower overall costs illinois chicago metro: edge computing advantage, less hyperscale wisconsin surprise: 5,800 mw announced (10 projects) despite cold climate

advantage: central us location + pjm/miso grid reliability + lower costs than coasts. expected to capture 20-25% of new investment 2025-2030.

southwest (texas vs. arizona vs. new mexico)

texas scale: largest state market, 27 projects, but reliability concerns arizona semiconductor synergy: tsmc driving co-located datacenter demand new mexico efficiency: small number of mega-projects, clean energy advantage

power challenge: all three face summer peak demand concerns and water scarcity. success depends on grid management and cooling innovation.

policy recommendations

for states seeking investment

  1. invest in infrastructure first: pre-build substations, transmission, water systems
  2. streamline permitting: 90-day approval processes attract time-sensitive ai projects
  3. workforce development: community college programs create local economic benefit
  4. cost-responsibility: require datacenter-funded infrastructure to protect ratepayers
  5. transparency: public disclosure of incentive terms builds community support

for established datacenter states

  1. manage saturation: identify constraints (land, power, water) before reaching crisis
  2. geographic diversification: expand to secondary markets within state
  3. incentive reform: shift from pure tax breaks to infrastructure co-investment
  4. community engagement: proactive outreach prevents prince william-style opposition
  5. grid planning: coordinate with utilities/isos on 10-20 year demand scenarios

for policymakers generally

  1. value-based competition: compete on infrastructure quality, not just tax giveaways
  2. fiscal accountability: clawback provisions if jobs/investment targets missed
  3. environmental standards: water use limits, renewable energy requirements
  4. equity considerations: ensure benefits reach broader community, not just landowners
  5. regional coordination: multi-state approaches to transmission, workforce

conclusion

state policy competition for datacenters has entered a mature phase characterized by:

  1. differentiation: states competing on value proposition, not just incentives
  2. cost-responsibility: shift away from “free” infrastructure toward operator-funded models
  3. sustainability integration: clean energy credentials becoming competitive necessity
  4. community engagement: recognition that local support essential for project viability
  5. fiscal discipline: growing scrutiny of incentive effectiveness and accountability

the $1.1 trillion investment pipeline demonstrates extraordinary economic opportunity, but states must balance aggressive competition with responsible policy. winners will be states that invest in infrastructure, develop workforce, streamline processes, and engage communities - not just those offering the largest tax breaks.

virginia’s dominance is declining (40% to 25% market share) as federal policies level the playing field and other states match incentives while offering better infrastructure. the next decade will see geographic diversification with pennsylvania, texas, ohio, and midwest states capturing larger shares.

the ultimate question: can states structure policies that attract datacenter investment while ensuring taxpayers, ratepayers, and communities benefit proportionally? early evidence from cost-responsibility models suggests it’s possible, but requires political will to resist pure subsidy competition.

on this page