datacenter state rankings: top 10 by investment, power, and project count

overview

the top 10 states dominate us datacenter investment and power capacity, accounting for 73.3% of disclosed investment (823.8bof823.8b of 1,123.4b total) and 64.8% of power capacity (85.4 gw of 131.7 gw total). this concentration reflects critical site selection factors: power availability, fiber infrastructure, tax incentives, and regulatory environment.

key insights

  • investment leader: new mexico ($167.2b) from single mega-project (project jupiter)
  • power leader: pennsylvania (16.9 gw) leveraging marcellus shale natural gas
  • project leader: virginia (40 projects) with data center alley dominance
  • emerging hubs: pennsylvania, texas, utah experiencing rapid growth
  • mega-projects: 46 projects ≥1 gw concentrated in top 10 states

top 10 states by investment

total investment: $823.8 billion (73.3% of disclosed us total)

RankStateInvestmentProjectsPower (GW)Avg/Project
1New Mexico167.2B</td><td>6</td><td>1.3</td><td>167.2B</td> <td>6</td> <td>1.3</td> <td>27.9B
2Kansas128.8B</td><td>9</td><td>1.8</td><td>128.8B</td> <td>9</td> <td>1.8</td> <td>14.3B
3Pennsylvania125.0B</td><td>12</td><td>16.9</td><td>125.0B</td> <td>12</td> <td>16.9</td> <td>10.4B
4Georgia79.8B</td><td>25</td><td>5.0</td><td>79.8B</td> <td>25</td> <td>5.0</td> <td>3.2B
5Texas78.2B</td><td>27</td><td>11.0</td><td>78.2B</td> <td>27</td> <td>11.0</td> <td>2.9B
6Arizona63.4B</td><td>22</td><td>8.7</td><td>63.4B</td> <td>22</td> <td>8.7</td> <td>2.9B
7Virginia56.6B</td><td>40</td><td>10.2</td><td>56.6B</td> <td>40</td> <td>10.2</td> <td>1.4B
8North Carolina49.3B</td><td>15</td><td>0.8</td><td>49.3B</td> <td>15</td> <td>0.8</td> <td>3.3B
9Ohio33.2B</td><td>10</td><td>4.2</td><td>33.2B</td> <td>10</td> <td>4.2</td> <td>3.3B
10Mississippi32.1B</td><td>10</td><td>1.3</td><td>32.1B</td> <td>10</td> <td>1.3</td> <td>3.2B
TOP 10 TOTAL813.6B</td><td>176</td><td>61.3</td><td>813.6B</td> <td>176</td> <td>61.3</td> <td>4.6B

detailed project breakdowns

1. New Mexico: $167.2B investment, 6 projects, 1.3 gw

ProjectInvestmentPower (MW)StatusSponsors
Project Jupiter (Stargate Santa Teresa Campus)$165.0BTBDannouncedBorderPlex Digital Assets, STACK Infrastructure
Meta Los Lunas Data Center Campus$2.2B40expansionMeta Platforms (Facebook)

2. Kansas: $128.8B investment, 9 projects, 1.8 gw

ProjectInvestmentPower (MW)StatusSponsors
Project Kestrel$100.0BTBDplannedHunt Midwest
Red Wolf DCD Properties Data Center Campus$12.6B600plannedRed Wolf DCD Properties LLC
Project Mica (Google AI Campus)$10.0B700plannedGoogle LLC, AG Rose Solutions LLC +1
De Soto Data Center Campus (Project Pilot)$3.1BTBDplannedMount Sunflower Properties, LLC, Beale Infrastructure +1
Meta Kansas City Data Center (Golden Plains Technology Park)$1.0BTBDoperationalMeta Platforms, Inc.
Google Kansas City Data Center (Hunt Midwest Business Center)$1.0B400under-constructionGoogle LLC, Alphabet Inc.
Patmos AI Campus (Kansas City Star Building)$1.0B100expansionPatmos
Edged Data Centers Kansas City$143M26operationalEdged Energy, Evergy

3. Pennsylvania: $125.0B investment, 12 projects, 16.9 gw

ProjectInvestmentPower (MW)StatusSponsors
Blackstone-QTS Northeastern Pennsylvania Data Centers$25.0BTBDplannedBlackstone, QTS Realty Trust
Google PJM Data Center Infrastructure$25.0B670plannedGoogle, Alphabet
Amazon Web Services AI Innovation Campuses$20.0B960under-constructionAmazon Web Services, Amazon
Pennsylvania Digital I (PAX)$15.0B1,350plannedPennsylvania Data Center Partners, PowerHouse Data Centers
Gouldsboro Data Center Campus$14.2B1,500planned1778 Rich Pike LLC, Quantm Group LLC
Homer City Energy Campus$10.0B4,500plannedHomer City Redevelopment, Kiewit Power Constructors
CoreWeave Lancaster County AI Data Center$6.0B100plannedCoreWeave, Chirisa Technology Parks +1
York 2 Energy Center Data Campus$5.0B828plannedEnergy Capital Partners, Calpine Corporation
Shippingport Power Station and Data Center$3.2B2,700plannedFrontier Group of Companies
Microsoft Three Mile Island Energy Supply$1.6B835plannedConstellation Energy, Microsoft

4. Georgia: $79.8B investment, 25 projects, 5.0 gw

ProjectInvestmentPower (MW)StatusSponsors
Project Bunkhouse$19.0B1,830plannedDigital Realty
Project Sail$17.0B936plannedAtlas Development LLC, Prologis
T5 Data Centers - Georgia Campus$16.0B1,200plannedT5 Data Centers
Amazon Web Services - Butts County Campus$5.5BTBDplannedAmazon Web Services
Amazon Web Services - Douglas County Campus$5.5BTBDplannedAmazon Web Services
Newton County Technology Park (Social Circle Technology Park)$5.0BTBDplannedTPA Group
Project Springbank$4.5B432plannedAtlas Development LLC
Microsoft - Union City Campus$1.8B324under-constructionMicrosoft
Google - Douglas County Campus$1.2BTBDoperationalGoogle
Google - Monroe County Campus$1.1BTBDplannedGoogle

5. Texas: $78.2B investment, 27 projects, 11.0 gw

ProjectInvestmentPower (MW)StatusSponsors
Stargate Project - Abilene Campus (Oracle/Crusoe)$40.0B1,200operationalOpenAI, Oracle +3
Vantage Data Centers - Frontier Campus$25.0B1,400under-constructionVantage Data Centers
ECP & KKR - Bosque County Campus$4.0B190under-constructionEnergy Capital Partners, KKR
Meta - Fort Worth Data Center Campus$1.5BTBDoperationalMeta
Microsoft - Medina County Data Centers$1.4BTBDunder-constructionMicrosoft
CyrusOne & Calpine - DFW10 Whitney Campus$1.2B190under-constructionCyrusOne, Calpine
GigaPop Data Center$1.0BTBDplannedGigabit Fiber, Lincoln Property Co. +1
Blueprint Projects - Taylor Data Center$1.0BTBDunder-constructionBlueprint Projects
Meta - Temple Data Center$800MTBDunder-constructionMeta
Google - Midlothian Data Center$600MTBDoperationalGoogle

6. Arizona: $63.4B investment, 22 projects, 8.7 gw

ProjectInvestmentPower (MW)StatusSponsors
Vermaland La Osa Data Center Park$33.0B3,000plannedVermaland LLC
Tract Buckeye Data Center Park$20.0B1,800plannedTract
Amazon AWS Project Blue (Tucson)$3.6B600canceledAmazon Web Services
Novva Data Centers Mesa Campus$3.0B300plannedNovva Data Centers
Vantage Data Centers Phoenix Campus$1.5B176under-constructionVantage Data Centers
Meta Mesa Data Center$1.0BTBDunder-constructionMeta
Google Mesa Data Center (Redhawk)$1.0BTBDunder-constructionGoogle
Microsoft West US 3 Azure Region$258MTBDoperationalMicrosoft
Edged Energy Mesa Data Center$70M36under-constructionEdged Energy

7. Virginia: $56.6B investment, 40 projects, 10.2 gw

ProjectInvestmentPower (MW)StatusSponsors
Prince William Digital Gateway$24.7B2,700announcedQTS Realty Trust, Compass Datacenters
EdgeCore Louisa County Campus$17.0B1,100announcedEdgeCore Digital Infrastructure
AWS Louisa County Campus 1$11.0BTBDunder-constructionAmazon Web Services
Meta Henrico White Oak Campus$1.7BTBDoperationalMeta
BlackChamber Virginia Portfolio$1.2B740under-constructionBlackChamber Group
AWS Spotsylvania County Campus$500MTBDplannedAmazon Web Services
AWS Culpeper County Campus$500MTBDannouncedAmazon Web Services

8. North Carolina: $49.3B investment, 15 projects, 0.8 gw

ProjectInvestmentPower (MW)StatusSponsors
Tract Mooresville Technology Park$30.0BTBDcanceledTract
Amazon Web Services (AWS) Richmond County Campus$10.0BTBDannouncedAmazon Web Services
Apple Maiden Data Center$5.0BTBDoperationalApple
Google Lenoir Data Center$1.2BTBDoperationalGoogle
Microsoft Catawba County Campus$1.0BTBDunder-constructionMicrosoft
WhiteFiber NC-1 Madison Data Center$1.0B24under-constructionWhiteFiber
Meta Forest City Data Center Campus$750MTBDoperationalMeta Platforms
DC BLOX High Point Data Center$305M18plannedDC BLOX

9. Ohio: $33.2B investment, 10 projects, 4.2 gw

ProjectInvestmentPower (MW)StatusSponsors
AWS US East (Ohio) Region$10.3B1,204expansionAmazon Web Services
Cologix Johnstown Campus$7.0B800plannedCologix
Google Central Ohio Campuses$6.7BTBDoperationalGoogle
Van Wert Mega Site Data Center$3.0B500plannedThor Equities Group
Vantage OH1 Campus$2.0B192under-constructionVantage Data Centers
Meta Prometheus (New Albany Campus)$1.5B1,000under-constructionMeta
QTS New Albany Campus$1.5B222under-constructionQTS Data Centers, Blackstone
Microsoft Licking County Campuses$1.0BTBDplannedMicrosoft
Aligned NEO-01 Campus$202M96under-constructionAligned Data Centers

10. Mississippi: $32.1B investment, 10 projects, 1.3 gw

ProjectInvestmentPower (MW)StatusSponsors
AWS Madison County Data Center Campus$16.0B650under-constructionAmazon Web Services
Compass Datacenters Meridian Campus$10.0B500under-constructionCompass Datacenters
AVAIO Digital Taurus Data Center Hub$6.0B116under-constructionAVAIO Digital Partners
Mississippi State University High Performance Computing Data Center$45MTBDunder-constructionMississippi State University
CleanSpark Clinton Bitcoin Mining Sites$6M16operationalCleanSpark

top 10 states by power capacity

total power: 85.4 gw (64.8% of disclosed us total)

RankStatePowerProjectsInvestment ($B)Avg/Project (MW)
1Pennsylvania16.9 GW12$125.01,408
2Texas11.0 GW27$78.2407
3Virginia10.2 GW40$56.6256
4Utah9.7 GW12$13.2806
5Arizona8.7 GW22$63.4396
6West Virginia7.5 GW8$5.0932
7Nevada5.8 GW20$9.4292
8Wisconsin5.8 GW10$19.1580
9Georgia5.0 GW25$79.8200
10Wyoming4.8 GW6$4.0800
TOP 10 TOTAL85.4 GW182$453.8469

detailed project breakdowns

1. Pennsylvania: 16.9 gw capacity, 12 projects, $125.0b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Homer City Energy Campus4,5004.50$10.0BplannedHomer City Redevelopment, Kiewit Power Constructors
TECfusions Keystone Connect3,0003.00TBDunder-constructionTECfusions
Shippingport Power Station and Data Center2,7002.70$3.2BplannedFrontier Group of Companies
Gouldsboro Data Center Campus1,5001.50$14.2Bplanned1778 Rich Pike LLC, Quantm Group LLC
Pennsylvania Digital I (PAX)1,3501.35$15.0BplannedPennsylvania Data Center Partners, PowerHouse Data Centers
Amazon Web Services AI Innovation Campuses9600.96$20.0Bunder-constructionAmazon Web Services, Amazon
Microsoft Three Mile Island Energy Supply8350.83$1.6BplannedConstellation Energy, Microsoft
York 2 Energy Center Data Campus8280.83$5.0BplannedEnergy Capital Partners, Calpine Corporation
Google PJM Data Center Infrastructure6700.67$25.0BplannedGoogle, Alphabet
fifteenfortyseven Chester County Hyperscale Campus4500.45TBDplannedfifteenfortyseven Critical Systems Realty, Green Fig Land Company

2. Texas: 11.0 gw capacity, 27 projects, $78.2b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Data City Texas5,0005.00TBDplannedEnergy Abundance Development Corp
PowerHouse & Provident - Grand Prairie Campus1,8001.80TBDunder-constructionPowerHouse Data Centers, Provident
Vantage Data Centers - Frontier Campus1,4001.40$25.0Bunder-constructionVantage Data Centers
Stargate Project - Abilene Campus (Oracle/Crusoe)1,2001.20$40.0BoperationalOpenAI, Oracle +3
Skybox Datacenters - PowerCampus Austin6000.60$125Munder-constructionSkybox Datacenters LLC
Texas Critical Data Centers (TCDC) - Ector County2500.25TBDplannedTexas Critical Data Centers
Stream Data Centers - San Antonio III2000.20$400Munder-constructionStream Data Centers
ECP & KKR - Bosque County Campus1900.19$4.0Bunder-constructionEnergy Capital Partners, KKR
CyrusOne & Calpine - DFW10 Whitney Campus1900.19$1.2Bunder-constructionCyrusOne, Calpine
CyrusOne DFW7 - Fort Worth700.07$200Munder-constructionCyrusOne

3. Virginia: 10.2 gw capacity, 40 projects, $56.6b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Prince William Digital Gateway2,7002.70$24.7BannouncedQTS Realty Trust, Compass Datacenters
CloudHQ LC Campus1,7001.70TBDoperationalCloudHQ
EdgeCore Louisa County Campus1,1001.10$17.0BannouncedEdgeCore Digital Infrastructure
CleanArc Virginia Hyperscale Campus1,0001.00TBDplannedCleanArc Data Centers
PowerHouse 95 Campus8000.80TBDunder-constructionPowerHouse Data Centers
BlackChamber Virginia Portfolio7400.74$1.2Bunder-constructionBlackChamber Group
Vantage VA3 Campus (Ashburn III)2880.29TBDplannedVantage Data Centers
QTS Richmond Expansion2400.24TBDplannedQTS Realty Trust, Blackstone
EdgeCore Culpeper Campus2160.22TBDannouncedEdgeCore Digital Infrastructure
Vantage VA1 Campus (Ashburn I)2060.21TBDoperationalVantage Data Centers

4. Utah: 9.7 gw capacity, 12 projects, $13.2b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Delta Gigasite / Fibernet MercuryDelta4,0004.00TBDplannedFibernet MercuryDelta LLC, Creekstone Energy +1
Joule Capital Partners - Millard County Campus4,0004.00TBDplannedJoule Capital Partners
Meta Eagle Mountain Data Center5040.50$1.5BoperationalMeta Platforms, Inc.
Tract - Project Tripletail4000.40$7.0BplannedTract
Aligned Data Centers - Salt Lake City Campus3520.35TBDexpansionAligned Data Centers
Novva Data Centers - West Jordan Campus1750.17$2.0Bunder-constructionNovva Data Centers, CIM Group
Cirrus Data Services - View 78 Campus1600.16TBDplannedCirrus Data Services, Gardner Company
NSA Utah Data Center (Bumblehive)650.07$1.5BoperationalNational Security Agency, U.S. Department of Defense
DataBank SLC6 - Bluffdale220.02TBDexpansionDataBank

5. Arizona: 8.7 gw capacity, 22 projects, $63.4b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Vermaland La Osa Data Center Park3,0003.00$33.0BplannedVermaland LLC
Tract Buckeye Data Center Park1,8001.80$20.0BplannedTract
QTS Phoenix 3 Campus (Glendale)7500.75TBDplannedQTS, Blackstone
Amazon AWS Project Blue (Tucson)6000.60$3.6BcanceledAmazon Web Services
NTT Global Data Centers Mesa Campus (Pecos & Crismon)3600.36TBDplannedNTT Global Data Centers
Compass Datacenters Goodyear Campus3500.35TBDunder-constructionCompass Datacenters
Novva Data Centers Mesa Campus3000.30$3.0BplannedNovva Data Centers
Stream Data Centers Phoenix Campus2800.28TBDunder-constructionStream Data Centers
Prime Data Centers Phoenix Campus2400.24TBDunder-constructionPrime Data Centers
NTT Global Data Centers Mesa Campus (Elliot Road)2400.24TBDoperationalNTT Global Data Centers

6. West Virginia: 7.5 gw capacity, 8 projects, $5.0b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Adams Fork Data Center Energy Campus - Harless Site2,4002.40TBDplannedTransGas Development Systems LLC
Adams Fork Data Center Energy Campus - Wharncliffe Site2,4002.40TBDplannedTransGas Development Systems LLC
Fundamental Data Tucker County Data Center1,6561.66TBDunder-constructionFundamental Data LLC
Monarch Cloud Campus (Fidelis New Energy)1,0001.00$5.0BplannedFidelis New Energy

7. Nevada: 5.8 gw capacity, 20 projects, $9.4b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Tract Silver Springs Data Center Park1,6001.60TBDplannedTract
Tract South Valley Technology Park1,2001.20TBDplannedTract
Tract Peru Shelf Technology Park8100.81TBDunder-constructionTract
Switch Citadel Campus (Tahoe Reno)6500.65TBDoperationalSwitch, DigitalBridge +1
TerraScale Energos Reno5000.50$3.0BplannedTerraScale
Switch CORE Campus Las Vegas4950.49TBDoperationalSwitch, DigitalBridge +1
Vantage Data Centers NV1 Campus2240.22$3.0Bunder-constructionVantage Data Centers
EdgeCore Reno Campus2160.22$1.2Bunder-constructionEdgeCore Digital Infrastructure, Partners Group
PowerHouse Reno Data Center650.07TBDunder-constructionPowerHouse Data Centers, Harrison Street
Novva Tahoe Reno Data Center600.06TBDoperationalNovva Data Centers

8. Wisconsin: 5.8 gw capacity, 10 projects, $19.1b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Cloverleaf Infrastructure Data Center Campus - Port Washington3,5003.50TBDplannedCloverleaf Infrastructure
Vantage Data Centers - Port Washington1,3001.30$8.0BplannedVantage Data Centers
OpenAI Stargate Data Center - Wisconsin (Evaluation)1,0001.00TBDplannedOpenAI, Oracle +1

9. Georgia: 5.0 gw capacity, 25 projects, $79.8b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Project Bunkhouse1,8301.83$19.0BplannedDigital Realty
T5 Data Centers - Georgia Campus1,2001.20$16.0BplannedT5 Data Centers
Project Sail9360.94$17.0BplannedAtlas Development LLC, Prologis
Project Springbank4320.43$4.5BplannedAtlas Development LLC
Microsoft - Union City Campus3240.32$1.8Bunder-constructionMicrosoft
DC BLOX - Atlanta East (Rockdale County)1440.14TBDunder-constructionDC BLOX
DC BLOX - Atlanta West (Douglas County)800.08TBDoperationalDC BLOX
CyrusOne - Douglas County Campus500.05$200MoperationalCyrusOne
Digital Realty - ATL13 (Downtown Atlanta)100.01TBDoperationalDigital Realty
Equinix - AT1 (Downtown Atlanta)40.00TBDoperationalEquinix

10. Wyoming: 4.8 gw capacity, 6 projects, $4.0b investment

ProjectPower (MW)Power (GW)InvestmentStatusSponsors
Crusoe/Tallgrass AI Data Center1,8001.80TBDannouncedCrusoe Energy Systems, Tallgrass Energy
Prometheus Hyperscale - Natrona/Converse County Campus1,5001.50$500MplannedPrometheus Hyperscale, Spiritus +1
Prometheus Hyperscale - WY-1 (Evanston Campus)1,2001.20TBDunder-constructionPrometheus Hyperscale
Related Digital Data Center (CoreWeave Campus)3020.30$1.2Bunder-constructionRelated Digital

top 10 states by project count

total projects: 199 (32.9% of 604 total)

RankStateProjectsInvestment ($B)Power (GW)Status Distribution
1Virginia40$56.610.215 op, 9 uc, 11 plan
2Illinois28$14.64.714 op, 6 uc, 8 plan
3Texas27$78.211.05 op, 16 uc, 5 plan
4California25$0.01.514 op, 4 uc, 6 plan
5Georgia25$79.85.09 op, 5 uc, 10 plan
6Arizona22$63.48.76 op, 9 uc, 5 plan
7New Jersey22$1.30.620 op, 2 uc, 0 plan
8Nevada20$9.45.813 op, 4 uc, 3 plan
9Washington18$7.20.412 op, 2 uc, 4 plan
10North Carolina15$49.30.87 op, 3 uc, 2 plan
TOP 10 TOTAL242$359.748.7115 op, 60 uc, 54 plan

comparative analysis

investment vs power efficiency

states with highest investment per gw of power capacity:

StateInvestment/GWTotal InvestmentTotal PowerInterpretation
South Carolina177.2B/GW</td><td>177.2B/GW</td> <td>12.4B0.1 GWmega-project dominance
New Mexico128.6B/GW</td><td>128.6B/GW</td> <td>167.2B1.3 GWmega-project dominance
Nebraska108.8B/GW</td><td>108.8B/GW</td> <td>3.7B0.0 GWmega-project dominance
Maine88.3B/GW</td><td>88.3B/GW</td> <td>5.3B0.1 GWmega-project dominance
Kansas70.4B/GW</td><td>70.4B/GW</td> <td>128.8B1.8 GWmega-project dominance
Oklahoma69.1B/GW</td><td>69.1B/GW</td> <td>21.4B0.3 GWmega-project dominance
North Carolina61.9B/GW</td><td>61.9B/GW</td> <td>49.3B0.8 GWmega-project dominance
Mississippi25.0B/GW</td><td>25.0B/GW</td> <td>32.1B1.3 GWcapital intensive
Washington20.0B/GW</td><td>20.0B/GW</td> <td>7.2B0.4 GWcapital intensive
Minnesota19.6B/GW</td><td>19.6B/GW</td> <td>6.5B0.3 GWcapital intensive

project density analysis

states with highest average investment per project:

StateAvg Investment/ProjectProjectsTotal InvestmentInterpretation
New Mexico27.9B</td><td>6</td><td>27.9B</td> <td>6</td> <td>167.2Blarge-scale projects
Kansas14.3B</td><td>9</td><td>14.3B</td> <td>9</td> <td>128.8Blarge-scale projects
Pennsylvania10.4B</td><td>12</td><td>10.4B</td> <td>12</td> <td>125.0Blarge-scale projects
Ohio3.3B</td><td>10</td><td>3.3B</td> <td>10</td> <td>33.2Bmid-scale projects
North Carolina3.3B</td><td>15</td><td>3.3B</td> <td>15</td> <td>49.3Bmid-scale projects
Mississippi3.2B</td><td>10</td><td>3.2B</td> <td>10</td> <td>32.1Bmid-scale projects
Georgia3.2B</td><td>25</td><td>3.2B</td> <td>25</td> <td>79.8Bmid-scale projects
Texas2.9B</td><td>27</td><td>2.9B</td> <td>27</td> <td>78.2Bmid-scale projects
Arizona2.9B</td><td>22</td><td>2.9B</td> <td>22</td> <td>63.4Bmid-scale projects
South Dakota2.7B</td><td>6</td><td>2.7B</td> <td>6</td> <td>16.0Bmid-scale projects

state selection factors

analysis of why top 10 states lead in datacenter development:

power availability & cost

pennsylvania (16.9 gw):

  • marcellus shale natural gas provides on-site power option
  • pjm interconnection market access
  • competitive industrial rates ($0.06-0.08/kwh)

texas (11.0 gw):

  • ercot deregulated market enables direct power purchasing
  • 186 gw datacenter interconnection queue
  • abundant wind/solar resources
  • competitive rates ($0.05-0.07/kwh)

virginia (10.2 gw):

  • dominion energy 40 gw datacenter pipeline commitment
  • pjm market access
  • established infrastructure in northern virginia
  • rates: $0.07-0.09/kwh

tax incentives & economic development

virginia: 928mannualsalestaxexemptionsonequipmentgeorgia:928m annual sales tax exemptions on equipment **georgia**: 296m annual sales tax exemptions north carolina: 1.2bincentivepackagesformajorprojectsohio:1.2b incentive packages for major projects **ohio**: 1.5b datacenter incentives 2024-2025 arizona: property tax abatements, accelerated depreciation

fiber infrastructure & connectivity

virginia: data center alley fiber density (100+ carriers) texas: diverse carrier presence, international gateway california: silicon valley/bay area internet exchange points new york: carrier-neutral metro facilities, transatlantic cables illinois: chicago internet exchange hub

regulatory environment

favorable: texas (minimal regulation), arizona (streamlined permitting) moderate: pennsylvania, ohio, georgia (balanced approach) complex: california (environmental review), new york (building codes)

climate & cooling advantages

free cooling potential (northern states):

  • minnesota, wisconsin, illinois: 6-8 months/year
  • reduced pue from 1.5 to 1.2-1.3
  • significant operating cost savings

water availability:

  • eastern states: abundant water for evaporative cooling
  • western states: water constraints drive dry cooling adoption

land availability & cost

low-cost land: mississippi, kansas, oklahoma, arkansas abundant acreage: texas, pennsylvania, utah (100-1000 acre campuses) constrained: california, new york, massachusetts (high costs, limited space)

mega-project concentration

46 projects ≥1 gw concentrated in top 15 states:

  • pennsylvania: 7 gigawatt projects
  • texas: 6 gigawatt projects
  • utah: 2 competing 4gw projects (total 8gw)
  • virginia: 5 gigawatt projects

ai/ml project distribution

140 ai/ml projects (23.2% of total) favor:

  • states with immediate power availability (texas, pennsylvania)
  • established hyperscaler presence (virginia, california)
  • aggressive incentive packages (ohio, georgia)

nuclear partnership states

24+ gw of smr partnerships concentrated in:

  • pennsylvania: constellation three mile island restart (837 mw)
  • virginia: dominion energy smr evaluation
  • ohio: energy harbor nuclear sites
  • multiple states: switch-oklo 12 gw nationwide

top 10 state concentration reflects critical infrastructure advantages: power availability, fiber connectivity, tax incentives, and regulatory environment. success in emerging hubs requires addressing utility capacity constraints, permitting processes, and community engagement while maintaining competitive economics.