hyperscaler entities: the giants driving ai infrastructure
on this page
Hyperscaler Entities: The Giants Driving AI Infrastructure
Hyperscalers are technology companies operating massive global data center networks at unprecedented scale. These entities are driving the exponential growth in data center development, collectively investing over $400 billion annually in AI-optimized infrastructure. This page provides a comprehensive overview of the seven major hyperscaler entities shaping the future of computing infrastructure.
Overview: The AI Infrastructure Race
The hyperscaler landscape is defined by an unprecedented capital deployment race driven by artificial intelligence demands. In 2025 alone, these seven entities will invest an estimated $450+ billion in data center infrastructure - more than the entire cloud computing industry spent in the previous five years combined. This explosive growth reflects AI’s transformative impact on computing requirements, with training large language models requiring GPU clusters consuming hundreds of megawatts of power.
Total Investment and Scale
- Combined 2025 Capex: $450+ billion
- Total US Datacenter Projects: 140+ tracked facilities
- Nuclear Power Commitments: 8+ GW across multiple partnerships
- Total Global Regions: 160+ cloud regions and availability zones
- GPU Deployments: 2+ million AI accelerators by end of 2025
The hyperscaler buildout represents the largest coordinated infrastructure investment in modern history, comparable in scale to the Interstate Highway System or rural electrification programs. Unlike traditional infrastructure, this buildout is happening in 3-5 year timeframes rather than decades.
Comprehensive Comparison
Company | Market Cap (USD) | Datacenter Projects | Total Investment | Focus Areas | Key Partnerships | Nuclear Commitments | AI Infrastructure |
---|---|---|---|---|---|---|---|
Microsoft | $3.8T | 28 | $80B (FY2025) | Azure cloud, OpenAI partnership, enterprise AI | Constellation (835MW TMI), Brookfield (10.5GW renewables), OpenAI ($13B investment) | Three Mile Island restart (835MW), SMR strategy with hired nuclear experts | 2GW annual capacity, Virginia/Ohio/PA expansion, capacity constrained through 2026 |
Google/Alphabet | $2.98T | 39 | $85B (2025) | Google Cloud, TPU infrastructure, open AI models | Kairos Power (500MW SMRs), NextEra (Duane Arnold restart), Fervo (115MW geothermal) | 500MW Kairos SMRs by 2035, Duane Arnold potential restart (615MW) | $15B India investment, Trillium TPU (6th gen), industry-leading 1.09 PUE |
Amazon/AWS | $2.2T | 20 | $100B (2025) | AWS cloud leadership, custom silicon, government cloud | Talen Energy (1.92GW nuclear), X-energy (5GW SMRs), GE Vernova (grid solutions) | 1.92GW Susquehanna direct connect, 5GW X-energy SMR partnership | PA $20B AI campuses, 960MW nuclear-powered DC, Graviton/Trainium custom chips |
Meta | $1.79T | 11 | $66-72B (2025) | Open-source Llama AI, internal infrastructure only | Constellation (1.1GW Clinton nuclear), Sage Geosystems (150MW geothermal) | 1.1GW Clinton nuclear (20-year agreement), advanced geothermal east of Rockies | Louisiana $10B/2GW facility, 1.3M+ GPUs, largest open-source AI training infrastructure |
Oracle | $878B | 3 | $10B+ (2025) | Enterprise database, OpenAI exclusive partner, Stargate | OpenAI (500B), Crusoe Energy (Abilene 1.2GW) | SMR permits secured for 3 reactors/1+GW DC - most concrete hyperscaler commitment | Stargate $500B initiative, 4.5GW for OpenAI, 400K GPUs in Abilene, fastest growth (52% YoY) |
OpenAI | Private | 9 | $500B (Stargate 2025-2029) | Foundation models (GPT, o-series), AGI research | Oracle (Stargate 13B investment, Azure infrastructure), SoftBank | Via Oracle Stargate facilities | Stargate 4.5GW Oracle partnership, Microsoft Azure dependency reduction, GPT-5 training |
xAI | Private | 1 | $6B+ raised | Grok models, Tesla/SpaceX integration | NVIDIA (100K H100 Colossus), BlackRock/GIP/MGX (AIP consortium investor) | Via AIP consortium investments | Colossus 100K GPU (Memphis 1GW), largest single-site GPU cluster, 6-month build |
Individual Entity Summaries
Microsoft Corporation
Market Position: #2 cloud provider (20% share), #1 by US datacenter projects (28)
Key Metrics:
- Market Cap: $3.8 trillion
- 2025 Capex: $80 billion (AI infrastructure)
- Azure Revenue: $75 billion (FY2025)
- Cloud Regions: 70+ with 163 availability zones
- US Projects: 28 tracked facilities
Strategic Approach: Microsoft pursues an aggressive AI infrastructure strategy driven by the OpenAI partnership (over $13 billion invested). The company is deploying 2GW of new capacity annually while facing persistent capacity constraints in Northern Virginia and Texas through H1 2026. Microsoft’s nuclear strategy is industry-leading: the historic Three Mile Island restart agreement with Constellation (835MW, 20-year PPA) represents the first major nuclear restart specifically for data center power. Additionally, Microsoft is hiring nuclear experts from TVA to implement a global SMR and microreactor strategy.
Differentiation:
- Enterprise Integration: 95% of Fortune 500 use Azure, creating massive ecosystem lock-in
- OpenAI Exclusive: Strategic partnership provides exclusive access to GPT-4 and latest models
- Nuclear First-Mover: Only hyperscaler with committed large reactor restart plus SMR strategy
- Hybrid Cloud Leadership: Azure Arc provides superior on-premises/cloud integration
- Cost Advantages: 5x cheaper than AWS for Windows Server and SQL Server workloads
Geographic Focus: Virginia (23B+), Pennsylvania expansion, international investments in Australia (3.2B), Germany (2.1B)
Power Strategy: “Everything everywhere all at once” approach combining nuclear (TMI 835MW + SMR pipeline), renewables (20+ GW contracted, largest corporate buyer), and innovative utility partnerships. Target: 24/7 carbon-free energy by 2030.
Google/Alphabet
Market Position: #3 cloud provider (13% share), #2 by US datacenter projects (39, including “Google LLC”)
Key Metrics:
- Market Cap: $2.98 trillion
- 2025 Capex: 75B)
- Google Cloud Revenue: $48 billion (2024)
- Cloud Regions: 40 regions, 121 availability zones
- US Projects: 39 tracked facilities
Strategic Approach: Google is the fastest-growing major cloud provider (32% YoY) with the most aggressive sustainability commitments in the industry: 24/7 carbon-free energy matching (not annual offsets) on every grid by 2030. The company achieved 64% CFE globally in 2024. Google differentiates through custom AI infrastructure (TPU Trillium 6th generation offering 4.7x performance improvement) and industry-leading efficiency (1.09 PUE vs. 1.56 industry average). The $15 billion India investment represents the largest Google commitment outside the US.
Differentiation:
- Custom AI Silicon: Proprietary TPUs provide alternatives to NVIDIA with superior economics for Google workloads
- Sustainability Leadership: 24/7 CFE goal most aggressive among hyperscalers, 64% achieved globally
- Efficiency Excellence: 1.09 PUE (84% less overhead than industry average)
- Open-Source Pioneer: Kubernetes, TensorFlow, and cloud-native technologies originated at Google
- Nuclear + Geothermal: Only hyperscaler with both 500MW SMR commitment AND 115MW enhanced geothermal
Geographic Focus: Iowa (15B), Virginia, Pacific Northwest. Strategic focus on power-rich locations with renewable energy access.
Power Strategy: Most comprehensive clean energy approach combining 20+ GW renewables, 500MW Kairos Power SMRs (first deployment 2030), 115MW Fervo enhanced geothermal (industry first), and Duane Arnold nuclear restart potential (615MW). Target: net-zero by 2030.
Amazon Web Services (AWS)
Market Position: #1 cloud provider (30% share), undisputed market leader
Key Metrics:
- Parent Market Cap: $2.2 trillion (Amazon.com)
- 2025 Capex: $100 billion (majority for AWS)
- AWS Revenue: $107.6 billion (2024)
- Cloud Regions: 38 regions, 120 availability zones
- US Projects: 20 tracked facilities
Strategic Approach: AWS maintains market leadership through first-mover advantages, the broadest service portfolio (200+ services), and operational excellence from the longest operating history (S3/EC2 launched 2006). The company’s nuclear strategy is most aggressive: 20B AI Innovation Campus represents the largest private investment in state history, co-locating 15 data centers with nuclear power.
Differentiation:
- Market Leadership: 30% share, 50% larger than Azure, 2.3x larger than Google Cloud
- Broadest Portfolio: 200+ services, most comprehensive offerings
- Custom Silicon: Graviton CPUs, Trainium/Inferentia AI chips offer 40-50% better price-performance than NVIDIA
- Nuclear Leadership: 1.92GW Talen partnership + 5GW X-energy SMRs most aggressive among hyperscalers
- Enterprise Dominance: 90%+ Fortune 100, 7,500+ US government agencies
Geographic Focus: Virginia (Northern Virginia + Louisa 23B+ through 2030), Oregon (20B AI campuses). Concentrated investments in power-rich regions.
Power Strategy: Multi-pronged approach combining direct nuclear (1.92GW Susquehanna + potential 5GW X-energy SMRs), renewables (400+ projects, 50,000+ GWh annually), and utility partnerships. Achieved 100% renewable matching in 2023, seven years ahead of 2030 goal.
Meta Platforms
Market Position: Internal infrastructure only (no cloud services sold), #3 by US projects (11)
Key Metrics:
- Market Cap: $1.79 trillion
- 2025 Capex: $66-72 billion (AI infrastructure)
- Revenue: $164.5 billion (2024, 98% advertising)
- Daily Active Users: 3+ billion across family of apps
- US Projects: 11 tracked facilities
Strategic Approach: Meta represents a unique hyperscaler model: building exclusively for internal use supporting 3+ billion daily active users rather than selling cloud services. The company has “reoriented entirely toward AI infrastructure” with 1.3+ million GPUs deployed by end 2025 - the world’s largest open-source AI training infrastructure. The Louisiana Richland Parish facility ($10B investment, 2GW capacity, 4 million sq ft) is the single largest data center investment in industry history, purpose-built for training future Llama models.
Differentiation:
- Open-Source AI: Llama models freely available, competing with closed alternatives without revenue constraints
- Largest AI Infrastructure: 1.3M+ GPUs, unprecedented compute for open models
- Water Efficiency: 0.18 WUE vs. 1.80 industry average (10x better)
- Open Compute Project: Shares hardware innovations (Grand Teton, Catalina) openly, driving industry cost reduction
- Nuclear Baseload: 1.1GW Constellation agreement provides reliable carbon-free power
Geographic Focus: Louisiana ($10B Richland Parish flagship), Iowa, Nebraska, Ohio (pre-leased more H2 2024 capacity than any hyperscaler), Texas, New Mexico. Concentrated on massive single-site investments.
Power Strategy: “All the above” combining 11,700+ MW renewables (world’s largest corporate buyer), 1.1GW Constellation nuclear (Clinton Clean Energy Center, 20-year agreement), and advanced geothermal (Sage Geosystems, first deployment east of Rockies). Achieved 100% renewable matching since 2020.
Oracle Corporation
Market Position: #5 cloud provider (3% share), explosive growth (52% YoY), Stargate exclusive partner
Key Metrics:
- Market Cap: $878 billion
- 2025 Capex: $10+ billion (excluding Stargate joint venture)
- Cloud Revenue: $10.2 billion (FY2025), growing 51% YoY
- Remaining Performance Obligations: $455 billion (up 359% YoY)
- Projected FY2030 Cloud Revenue: $144 billion
Strategic Approach: Oracle’s strategy centers on the historic 500 billion Stargate initiative, positioning Oracle as exclusive infrastructure provider for one of the world’s leading AI companies. The company is building gigawatt-scale GPU campuses including Abilene (1.2GW, 400K GPUs) and Santa Teresa Project Jupiter ($165B over 30 years). Oracle’s SMR nuclear strategy is most concrete among hyperscalers: building permits already secured for three SMRs to power a 1+ gigawatt data center, per Larry Ellison.
Differentiation:
- OpenAI Exclusive: $300B five-year contract for 4.5GW capacity, largest cloud deal in history
- Database Optimization: 5-10x better price-performance than AWS/Azure for Oracle workloads
- SMR Permits Secured: Only hyperscaler with building permits for three SMRs (1+ GW)
- Stargate Scale: $500B initiative with SoftBank/MGX representing unprecedented AI infrastructure investment
- Founder Control: Larry Ellison 40.79% ownership enables long-term strategic decisions
Geographic Focus: Texas (Abilene Stargate operational, additional sites), New Mexico (Santa Teresa $165B Project Jupiter), traditional OCI regions (Ashburn VA, Chicago IL, Phoenix AZ). Building “more data centers than all competitors combined” per Ellison.
Power Strategy: Nuclear-first approach with SMR building permits secured (vendor TBD, likely 2030+ deployment). Near-term reliance on natural gas (Crusoe Abilene) and utility partnerships. Committed to 100% renewable energy for OCI by 2025 (achieved in Europe/Latin America).
OpenAI
Market Position: Private AI research company, driving unprecedented infrastructure demand via Stargate
Key Metrics:
- Status: Private company ($157B valuation October 2024)
- Stargate Investment: $500 billion (2025-2029)
- Oracle Infrastructure: 4.5GW capacity, $300B five-year commitment
- Microsoft Investment: $13+ billion cumulative
- US Projects: 9 tracked Stargate facilities
Strategic Approach: OpenAI’s infrastructure strategy revolves around the $500 billion Stargate initiative with Oracle, SoftBank, and MGX, representing the largest coordinated AI infrastructure investment in history. The partnership enables OpenAI to access 4.5GW of compute capacity without direct ownership, maintaining focus on AI research and product development. While maintaining Microsoft Azure relationship, the Oracle partnership provides massive incremental capacity for training next-generation models (GPT-5, o-series successors) and reduces dependence on any single provider.
Differentiation:
- Stargate Scale: $500B investment dwarfs all competitors’ AI infrastructure commitments
- Dual Infrastructure: Microsoft Azure partnership + Oracle exclusive 4.5GW Stargate capacity
- Model Leadership: GPT-4o, o1 reasoning models, GPT-5 in training on Stargate infrastructure
- Anchor Tenant: First customer of multiple Texas Stargate facilities, setting buildout pace
- AGI Focus: Infrastructure explicitly designed for AGI development and deployment at scale
Geographic Focus: Texas (Abilene operational, Shackelford County, Milam County), New Mexico (Santa Teresa Project Jupiter), Ohio (Lordstown), plus Midwest expansion. All Stargate sites within US.
Power Strategy: Relies on Oracle’s infrastructure partnerships including SMR nuclear commitments, natural gas generation (Crusoe Abilene), and utility agreements. Does not directly negotiate power agreements, leveraging Oracle’s operational expertise.
xAI
Market Position: Elon Musk’s AI startup, builder of world’s largest single-site GPU cluster
Key Metrics:
- Status: Private company ($6B Series B funding May 2024)
- Colossus Supercomputer: 100,000 NVIDIA H100 GPUs
- Power Capacity: 1 GW (Memphis facility)
- Build Timeline: 122 days (record-breaking deployment speed)
- Consortium Investment: AIP (BlackRock/GIP/MGX) member
Strategic Approach: xAI’s strategy emphasizes rapid deployment of massive GPU clusters for training Grok models, leveraging Elon Musk’s operational intensity and Tesla/SpaceX integration for accelerated timelines. The Memphis Colossus facility represents the world’s largest single-site GPU cluster, built in just 122 days - a feat industry experts considered impossible. xAI participates in the AI Infrastructure Partnership (AIP) consortium alongside Microsoft, NVIDIA, and other partners, potentially accessing additional capacity beyond the Memphis facility.
Differentiation:
- Colossus Scale: 100,000 H100 GPUs in unified cluster, largest single training system
- Speed Record: 122-day build from groundbreaking to operational (unprecedented in industry)
- Musk Integration: Direct access to Tesla data for AI training, SpaceX partnership potential
- AIP Membership: Consortium participation provides access to broader infrastructure network
- Operational Intensity: Elon Musk’s “production hell” approach applied to AI infrastructure
Geographic Focus: Memphis, Tennessee (Colossus facility). Future expansion plans not publicly disclosed but likely tied to AIP consortium investments.
Power Strategy: Memphis Colossus utilizes 1GW power capacity with Tennessee Valley Authority supplying electricity. Reliance on grid power with natural gas generation backup. Future AIP facilities may include nuclear partnerships through consortium members.
Strategic Approaches Analysis
Build vs. Lease Strategies
Hyperscalers employ varying approaches to infrastructure ownership:
Full Ownership Models (Microsoft, Google, Meta):
- Direct control over design, construction, operations
- Long-term cost optimization and vertical integration
- Multi-decade asset planning enabling custom innovations
- Higher upfront capital but lower long-term operational costs
Hybrid Approaches (AWS, Oracle):
- Mix of owned facilities and third-party leases
- Partnership with specialists (Crusoe, STACK Infrastructure)
- Faster time-to-market for AI capacity
- Off-balance-sheet structures maintain financial flexibility
Anchor Tenant Model (OpenAI, xAI):
- Long-term leases with operational partners
- Focus capital on AI research rather than real estate
- Leverage infrastructure providers’ expertise and scale
- Flexibility to adapt as AI requirements evolve
Geographic Distribution
Power-First Strategy (Oracle, Meta):
- Site selection driven by gigawatt-scale power availability
- Acceptance of rural or secondary locations (Louisiana, Texas)
- Long-term partnerships with utilities for new generation capacity
- Trade-offs: longer fiber runs, talent recruitment challenges
Enterprise Proximity (Microsoft, AWS, Google):
- Balance power availability with customer/talent location
- Concentration in established tech hubs (Northern Virginia, Bay Area)
- Edge expansion to secondary markets as primary metros saturate
- Multi-region redundancy for business continuity
Nuclear Colocation (AWS Pennsylvania):
- Strategic positioning adjacent to existing nuclear plants
- Behind-the-meter arrangements bypass grid constraints
- Limited availability: few suitable nuclear sites remain
- Competitive advantage for sites secured early
Power Sourcing Strategies
Nuclear Leadership (Microsoft, AWS, Oracle):
- Microsoft: Three Mile Island 835MW restart + SMR hiring strategy
- AWS: Talen 1.92GW Susquehanna + X-energy 5GW SMRs
- Oracle: Building permits for three SMRs, 1+ GW capacity
- Rationale: Baseload carbon-free power for 24/7 AI operations, hedge against renewable intermittency
Renewable Dominance (Google, Meta):
- Google: 20+ GW renewables + 500MW SMRs + 115MW geothermal
- Meta: 11,700+ MW renewables + 1.1GW nuclear + advanced geothermal
- Approach: Massive renewable portfolios provide cost certainty, sustainability credentials
- Challenge: Achieving 24/7 CFE requires firm power (nuclear/geothermal) supplementing renewables
Utility Innovation (All):
- Clean Transition Tariffs (Google/NV Energy/Fervo)
- Accelerating Clean Energy programs (Duke Energy with Amazon, Google, Microsoft, Meta, Nucor)
- Behind-the-meter agreements (AWS Susquehanna colocation)
- Bilateral partnerships sharing infrastructure costs with utilities
AI Infrastructure Focus
Custom Silicon Strategies:
- AWS: Graviton (ARM CPUs), Trainium/Inferentia (AI accelerators) reducing NVIDIA dependency
- Google: TPU Trillium 6th generation, 4.7x performance improvement, proprietary advantage
- Meta: MTIA (Meta Training and Inference Accelerator) for optimized inference workloads
- Microsoft/Oracle: Pure NVIDIA strategy, massive H100/Blackwell deployments
Cluster Scale Race:
- Meta: 1.3M+ GPUs by end 2025, largest open-source AI training infrastructure
- Oracle/OpenAI: 400K GPUs Abilene (operational), path to millions via Stargate expansion
- xAI: 100K GPU Colossus, world’s largest single-site cluster
- Microsoft: Capacity-constrained through 2026 despite massive investments
- AWS/Google: Scaling GPU deployments but specific counts undisclosed
Open vs. Closed AI:
- Open Models (Meta, Google): Llama, Gemini open variants drive ecosystem adoption
- Closed APIs (Microsoft/OpenAI): GPT-4 exclusive access via Azure OpenAI Service
- Hybrid (AWS): Amazon Nova models plus support for external models via Bedrock
- Strategic Implications: Open models prevent vendor lock-in, closed models enable revenue capture
Cloud Market Context
Market Share Dynamics
Current Market Position (Q2 2025):
- AWS: 30-32% (dominant leader, first-mover advantages)
- Microsoft Azure: 20-21% (fastest growth among top 3, enterprise integration)
- Google Cloud: 11-13% (third place but outperforming in AI workloads)
- Alibaba Cloud: 4% (international markets, China-focused)
- Oracle Cloud: 3% (fastest growth rate at 52% YoY, niche strength in Oracle workloads)
Growth Trajectories:
- Oracle: 52% YoY (fastest among major providers, driven by OpenAI contract)
- Google: 32% YoY (second-fastest, AI/ML workload strength)
- Microsoft: 20-25% YoY (solid growth from large base, enterprise expansion)
- AWS: 19% YoY (mature growth from dominant position, still generating $108B+ revenue)
Revenue Scale
Annual Cloud Infrastructure Revenue (2024-2025):
- AWS: $107.6 billion (largest absolute revenue)
- Microsoft Azure: ~$75 billion (estimated from Intelligent Cloud segment)
- Google Cloud: $48 billion (achieved profitability in 2024)
- Oracle Cloud Infrastructure: $10.2 billion (explosive growth trajectory)
Profitability:
- AWS: $39.8 billion operating income (37% margin), generates 60% of Amazon total profit
- Azure: Strong margins but not separately disclosed, integrated into Microsoft financials
- Google Cloud: $1.9 billion Q3 2024 operating income alone (17% margin), dramatic improvement from prior losses
- Oracle OCI: Profitable from inception due to database migration focus, margins undisclosed
Capital Expenditure Arms Race
2025 Capex Commitments (predominantly data center infrastructure):
- Amazon/AWS: 83B in 2024)
- Microsoft: $80 billion (FY2025, over 50% in US)
- Google/Alphabet: 75B guidance)
- Meta: 60-65B guidance)
- Oracle: $10+ billion (excluding Stargate joint venture accounting)
Stargate Additional Investment: $500 billion (2025-2029, primarily Oracle-led with SoftBank/MGX/OpenAI)
Total 2025 Hyperscaler Capex: $450+ billion (excluding Stargate unique accounting)
This represents a 60-80% year-over-year increase across the industry, reflecting AI’s transformative infrastructure requirements and the race to secure capacity before competitors.
Key Takeaways
-
Unprecedented Scale: Hyperscalers will invest $450+ billion in 2025 alone, more than the prior five years combined, driven by AI infrastructure demands.
-
Nuclear Power Leadership: Combined 8+ GW of nuclear commitments across Microsoft (835MW + SMR pipeline), AWS (1.92GW + 5GW SMRs), Meta (1.1GW), Oracle (1+ GW SMRs), and Google (500MW SMRs) represent the largest corporate nuclear energy procurement in history.
-
Market Concentration: AWS, Azure, and Google Cloud control 63-66% of cloud infrastructure market, but Oracle and specialized AI providers (OpenAI/Oracle partnership) are disrupting with focused strategies.
-
Regional Focus: Texas, Virginia, Ohio, Iowa, Louisiana, and New Mexico emerging as AI infrastructure hubs due to power availability, land, and favorable regulatory environments.
-
Custom Silicon Trend: AWS (Graviton/Trainium), Google (TPUs), Meta (MTIA) developing proprietary AI chips to reduce NVIDIA dependence and improve economics, while Microsoft and Oracle remain NVIDIA-exclusive.
-
Sustainability as Requirement: All hyperscalers committed to 100% renewable matching, with Google and Meta achieving 24/7 carbon-free energy goals most aggressively. Nuclear partnerships reflect recognition that AI workloads require firm, dispatchable carbon-free power beyond intermittent renewables.
-
Open vs. Closed AI: Meta’s open-source Llama and Google’s open model variants compete with Microsoft/OpenAI’s closed API approach, representing fundamental philosophical and business model differences in AI deployment.
-
Speed to Market: xAI’s 122-day Colossus deployment and Oracle’s rapid Stargate buildout demonstrate that traditional 2-3 year data center timelines are compressing under competitive pressure and operational intensity.
Data Sources
This analysis draws from the comprehensive hyperscaler entity dossiers maintained in /support/datacenters/entities/hyperscalers/*.json
and project tracking database /support/datacenters/analysis/all_projects.json
. Project counts verified through direct analysis of structured data as of October 2025.
Entity Dossiers:
- Microsoft:
/support/datacenters/entities/hyperscalers/microsoft.json
- Google/Alphabet:
/support/datacenters/entities/hyperscalers/google.json
- Amazon/AWS:
/support/datacenters/entities/hyperscalers/amazon.json
- Meta:
/support/datacenters/entities/hyperscalers/meta.json
- Oracle:
/support/datacenters/entities/hyperscalers/oracle.json
- OpenAI:
/support/datacenters/entities/hyperscalers/openai.json
- xAI:
/support/datacenters/entities/hyperscalers/xai.json
Project Database: /support/datacenters/analysis/all_projects.json
Data reflects publicly announced investments, regulatory filings, earnings reports, and industry publications through October 16, 2025.